Work has been completed on the new hydroelectric power plant on the River Thames at Sandford. It cost more than £3million to build and will provide enough power for 450 homes. There is one snag, however, as low river levels mean the power plant remains non-operational for the time being. Adriano Figueiredo, operations director at […]
The post Water way to power homes – when river is high enough appeared first on Oxfordshire Guardian.