Dozens of angry residents have accused Network Rail of not providing suitable evidence to destroy a grade-II listed railway bridge. The tracks operator has applied to demolish then reconstruct the bridge at Steventon and close off High Street as part of a 10-month project to electrify the railway. The bridge could be closed in December, […]
The post Is this the end of the line for railway bridge in Steventon? appeared first on Oxfordshire Guardian.